中文
bird
Fangchenggang> Doing Business

Investment projects

(fcgs.org.cn) 2014-11-25

1. City tourism complex project

Construction site: Jiangshan Byland Tourism Resort in the city of Fangchenggang

Project description: The project is going to be built at the entrance of Jiangshan Byland tourism road, situated near the coast guard wharf. It covers an area of around 800mu (53 hectares).

A stunningly high-quality city tourism complex is planned to be built, including: hotels, special seafood streets, shopping streets, tourist distributing centers, business and commercial affairs buildings, and tourism real estate.

Total investment and amount of planned foreign capital intake: Three billion yuan ($492 million).

Cooperation mode: Sole proprietorship

Contacts: Fangchenggang Tourism Bureau

Contact person: Feng Li’na

Tel: 0770-6106833

Validity period of project: Frobm 2013 to 2015.

2. Healthcare and medical treatment project

Construction site: Jiangshan Byland.

Project description: The direction and target of the development is focused on building high-end Medical Examination Centers (MEC’s), healthcare centers, medical colleges, star hotels and conference centers.

It is an international complex project covering healthcare services, medical treatment, medical education and tourism industries.

Total investment and amount of planned foreign capital intake: Above 700 million yuan ($115 million).

Cooperation mode: Sole proprietorship, cooperation or joint venture.

Contacts: Administration Committee of Jiangshan Byland Tourism Resort

Tel: 0770-3398088, 3398011

Validity period of project: from year 2014 to 2016.

3. Ocean park project

Construction site: Jiangshan Byland.

Project descripton: This development intends to build a large theme park, containing both an aquarium and an amusement park, which will to combine tourism, entertainment and popular science.

Total investment and amount of planned foreign capital intake: Above 600 million yuan ($98 million).

Cooperation mode: Sole proprietorship, cooperation or joint venture.

Contacts: Administration Committee of Jiangshan Byland Tourism Resort.

Tel: 0770-3398088, 3398011

Validity period of project: from year 2014 to 2016.

4. Mould machining center project

Construction site: Big Southwest Lin’gang Industrial Zone (an industrial zone near the port) in Fangchenggang.

Category and industry belonged to: Downstream industry of steels, secondary industry.

Project description: The project covers an area of 30mu (two hectares) with an annual output of 400 sets of precise moulds for nonmetal products.

It contains 8,000 square meters of manufacturing workshops, 1,000 square meters of office buildings, 3,000 square meters of warehouses, 1,000 square meters containing of dorms and canteens, as well as other supporting facilities.

Total investment and amount of planned foreign capital intake: 41 million yuan ($6.7 million).

Cooperation mode: Sole proprietorship

Contacts: Fangchenggang Merchants Promotion Bureau

Contact persons: Lao Yongjian, Huang Hongyan, Wang Qiuzhen

Tel: 0770-2217509

Program of project completion: Project proposals completed

Validity period of project: From 2012 to 2015

5. Port machinery production project.

Construction site: Fangchenggang Qisha Industrial Zone or Big Southwest Lin’gang Industrial Zone

Project description: The project aims to build 100 medium and small sized gantry cranes, 80 rotary cranes, 240 ship unloaders, 200 grapplers, and production lines with equivalent productivity of 2,000 tons of large-scale structures.

Total investment and amount of planned foreign capital intake: One billion yuan ($164 million).

Cooperation mode: Sole proprietorship

Contacts: Fangchenggang Merchants Promotion Bureau

Contact persons: Lao Yongjian, Huang Hongyan, Wang Qiuzhen

Tel: 0770-2217509

Validity period of project: from year 2012 to 2015.

6. Major automobile structure production project

Construction site: Fangchenggang Qisha Industrial Zone

Category and industry belonged to: Downstream industry of steels, secondary industry.

Project description: According to the market output of steel and automobile manufacturing industries around Fangchenggang and Northen Bay, there is a market demand for the major structures of the automobile in ASEAN (the Association of Southeast Asian Nations) and the Big Southwest Region (a region contains six southwest provinces, such as Guangxi, Sichuan, Yunnan and Tibet).

The project will oversee the construction of 35,000 square meters of main workshops for lightweight steel structures and form production lines for axles, automobile carriages and chassis.

Total investment and amount of planned foreign capital intake: 15 billion yuan ($2.46 billion).

Cooperation mode: Sole proprietorship

Contacts: Fangchenggang Commerce Promotion Bureau

Contact persons: Lao Yongjian, Huang Hongyan, Wang Qiuzhen

Tel: 0770-2217509

Program of project completion: Project proposals completed

Validity period of project: From 2012 to 2015.

7. Auto parts production project

Construction site: Fangchenggang Qisha Industrial Zone

Project description: The project is set to build production lines of automobile gear boxes, clutches, radiators and arresters. It contains building workshops, warehouses, exhibition halls, office buildings, dorms, canteens etc.

Total investment and amount of planned foreign capital intake: 700 million yuan ($115 million).

Cooperation mode: Sole proprietorship

Contacts: Fangchenggang Merchants Promotion Bureau

Contact persons: Lao Yongjian, Huang Hongyan, Wang Qiuzhen

Tel: 0770-2217509

Program of project completion: Project proposals completed.

Validity period of project: from year 2012 to 2015.

8. City automatic cubic-parking equipment project

Construction site: Fangchenggang Qisha Industrial Zone

Program description: The project will build the production lines of cubic-parking equipment, with annual productivity of 10,000 parking spaces.

The main constructions contain: 22,857 square meters of workshops, 3,453 square meters of warehouses, an 890 square meter testing center, 507 square meters of assistant houses, 2,093 square meters of R&D centers, 690 square meters of canteens and other supporting facilities relating to this project.

Total investment and amount of planned foreign capital intake: 500 million yuan ($82 million).

Cooperation mode: Sole proprietorship

Contacts: Fangchenggang Commerce Promotion Bureau

Contact persons: Lao Yongjian, Huang Hongyan, Wang Qiuzhen

Tel: 0770-2217509

Validity period of project: from year 2012 to 2015.

9. Production project of valves used in environmentally acceptable nuclear power

Construction site: Fangchenggang Qisha Industrial Zone

Project description: The project plans to produce 4,000 nuclear grade ball valves and 4,000 nuclear grade butterfly valves annually.

Total investment and amount of planned foreign capital intake: 200 million yuan ($32.8 million).

Cooperation mode: Sole proprietorship

Contacts: Fangchenggang Merchants Promotion Bureau

Contact persons: Lao Yongjian, Huang Hongyan, Wang Qiuzhen

Tel: 0770-2217509

Program of project completion: Project proposals completed.

Validity period of project: from year 2014 to 2017.

Footer bakcground
Copyright © 2014 China Daily. All Rights Reserved.
Sponsored by Fangchenggang Municipal Government. Powered by China Daily